No | Nama Peserta | K | B | A | T | P | PT | HN | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. PURNABRI - 01.120.123.3-403.000 | Rp. 4.206.595.693,72 |
Rp. 4.206.595.693,72 |
Rp. 4.206.595.693,72 | ||||||||
2 | CV Mars Baja / H. Suharman - 02.654.643.2-016.000 | |
|
|||||||||
3 | CV. KAZIRENGGA - 02.268.655.4-404.000 | Rp. 4.339.205.485,01 |
Rp. 4.339.205.485,01 |
Tidak melampirkan Dokumen Penawaran Teknis secara lengkap | ||||||||
4 | CV. Arya Sena - 31.208.743.0-403.000 | Rp. 4.288.605.485,01 |
Rp. 4.288.605.485,01 |
Tidak melampirkan Dokumen Penawaran Teknis secara lengkap | ||||||||
5 | PT. GALUNGGUNG JAYA ABADI - 90.091.726.1-403.000 | Rp. 4.029.708.514,69 |
Rp. 4.029.708.514,69 |
1). Daftar Peralatan Utama Minimal yang diusulkan, tidak dilengkapi dengan Surat Perjanjian Sewa Peralatan; 2). Surat Dukungan Penutup Atap Genteng Bitumen tidak disertai dengan surat pernyataan garansi jaminan kualitas bahan dan warna minimal 10 tahun; 3). Metoda pelaksanaan pekerjaan tidak menggambarkan penguasaan dalam penyelesaian pekerjaan di lapangan, diantaranya karena : a). Tidak ada pekerjaan pematangan lahan, termasuk didalamnya tidak ada pekerjaan Pek. Land Clearing (Termasuk penebangan pohon+akar dan buang Batang+ranting), Pek. Stripping / Perataan tanah, Pek. Pemadatan tanah menggunakan alat berat (area urugan). b). Tidak ada pekerjaan Dinding Penahan Tanah, termasuk didalamnya Pekerjaan Dinding Penahan Tanah Type TPT1 (Area belakang gedung) (28 M) dan Pekerjaan Dinding Penahan Tanah Type TPT2 (Area Tangga penghubung) (6,6 M). c). Tidak ada pekerjaan Pengecatan dinding Epoxy, 1000 micron (Area IGD, Lab, Depo Obat). d). Tidak ada Pekerjaan huruf dan Logo. e). Tidak ada pekerjaan Penyambungan Daya PLN, termasuk didalamnya Pekerjaan Pasang Baru Daya Listrik PLN 23 KVA serta instalatir dan Concuil. 4). Tidak melampirkan surat-surat pernyataan dari penyedia secara lengkap. | ||||||||
6 | JEL'S PUTRAJAYA - 80.269.399.4-403.000 | |
|
|||||||||
7 | PT. Karya Guna Inti Utama - 71.496.486.3-017.000 | |
|
|||||||||
8 | PT. Moses Edgar Partogi Utama - 75.065.530.0-435.000 | |
|
|||||||||
9 | CV.ANUGRAHNA BERSAMA - 31.581.986.2-403.000 | |
|
|||||||||
10 | CV BUMI WASTHU KENCANA - 73.948.025.9-426.000 | |
|
|||||||||
11 | PT. PAGARAN POKKI - 31.299.023.7-403.000 | |
|
|||||||||
12 | CV GUNA MANDIRI JAYA - 84.509.564.5-448.000 | |
|
|||||||||
13 | CV. Naga Timbul - 84.512.310.8-436.000 | |
|
|||||||||
14 | PT. SARI JAYA MAJU - 84.878.023.5-008.000 | |
|
|||||||||
15 | CV. PALMA TIARA - 02.740.289.0-404.000 | |
|
|||||||||
16 | Sistem Fisik Siber - 86.380.049.6-801.000 | |
|
|||||||||
17 | CV.INOVASI GLOBAL - 83.551.215.3-085.000 | |
|
|||||||||
18 | cv.sabam mandiri - 02.339.024.8-412.000 | |
|
|||||||||
19 | PT. KHARISMA TANJUNG SELARAS - 70.346.359.6-434.000 | |
|
|||||||||
20 | CV. SIMPUL PRIMA GEMILANG - 01.850.406.8-009.000 | |
|
|||||||||
21 | CV. KARUNIA TULUS ABADI - 03.190.343.8-027.000 | |
|
|||||||||
22 | PT. MAHAKARYA GUSTI ABADI - 85.621.073.7-077.000 | |
|
|||||||||
23 | CV. MULTI KARYA MANDIRI - 72.142.446.3-412.000 | |
|
|||||||||
24 | DEWO SEJAHTERA BERSAMA - 81.365.450.6-086.000 | |
|
|||||||||
25 | cv. yudiswara - 81.341.153.5-404.000 | |
|
|||||||||
26 | CV. BOGATALLA - 21.132.231.8-403.000 | |
|
|||||||||
27 | PT. TOLPING JAYA - 01.628.661.9-008.000 | |
|
|||||||||
28 | PT.ROBEN PEKAYON INDAH - 01.359.891.7-005.000 | |
|
|||||||||
29 | CV. FIKA MULYA - 31.429.763.1-403.000 | |
|
|||||||||
30 | PT. BUHA RIAMA - 01.401.683.6-008.000 | |
|
|||||||||
31 | ANUGRAH EMDITI - 02.564.047.5-445.000 | |
|
|||||||||
32 | CV. BAGJA WIRAKARYA - 75.197.016.1-445.000 | |
|
|||||||||
33 | CV. Fatma Jaya Abadi - 02.065.402.6-423.000 | |
|
|||||||||
34 | CV.AULIMINDO UTAMA - 21.056.206.2-412.000 | |
|
|||||||||
35 | PT. TAWARIKH - 01.331.086.7-412.000 | |
|
|||||||||
36 | CV. AEK SIPANGOLU INDAH - 02.452.550.3-127.000 | |
|
|||||||||
37 | CV. MITRA TEKNIKINDO - 02.381.158.1-412.000 | |
|
|||||||||
38 | CV. KEVIN JAYA MANDIRI KONTRAKTOR - 83.824.277.4-412.000 | |
|
|||||||||
39 | PT. HERONA HARAPAN - 02.902.434.6-005.000 | |
|
|||||||||
40 | CV. JUDAH KARYA - 71.463.066.2-122.000 | |
|
|||||||||
41 | CV. MURAI INDAH - 01.508.864.4-438.000 | |
|
|||||||||
42 | cv.aulia agastha - 02.730.432.8-434.000 | |
|
|||||||||
43 | CV. Cipta Anugrah Pratama - 83.770.039.2-911.000 | |
|
|||||||||
44 | CV.SERINTUNAN - 01.857.022.6-403.000 | |
|
|||||||||
45 | cv. karya banten sejati - 80.259.256.8-401.000 | |
|
|||||||||
46 | Cv sentosa jaya persada - 83.511.465.3-434.000 | |
|
|||||||||
47 | PT OPTIMA TEKNIK INDONESIA - 81.866.878.2-436.000 | |
|
|||||||||
48 | CV. LAM GANDA - 31.172.476.9-403.000 | |
|
|||||||||
49 | PT. DAPOT MAHADY JAYA - 01.585.979.6-009.000 | |
|
|||||||||
50 | CV. SARI MUTIARA INDAH - 01.336.567.1-008.000 | |
|
|||||||||
51 | PT. PERKASA CITRA UNGGUL - 31.398.368.6-027.000 | |
|
|||||||||
52 | CV. SURYA GEMILANG - 31.493.910.9-403.000 | |
|
|||||||||
53 | CV. ARUZIKI - 31.266.038.4-404.000 | |
|
|||||||||
54 | PT. CATAHI BANGUN NEGERI - 31.499.590.3-403.000 | |
|
|||||||||
55 | PT TOTALPLUS ABIGAIL SENTOSA - 85.436.507.9-008.000 | |
|
|||||||||
56 | CV. SATRIA PRATAMA - 66.158.703.0-424.000 | |
|
|||||||||
57 | PT.SEKAWAN ANUGERAH UTAMA - 83.824.772.4-407.000 | |
|
|||||||||
58 | PT.Metro Silangit Mandiri - 75.880.277.1-435.000 | |
|
|||||||||
59 | CV. ELDYRA REKAYASA ARSITEK - 01.989.782.6-307.000 | |
|
|||||||||
60 | PT. POLTAKAN TOGI RAYA - 82.539.703.7-403.000 | |
|
|||||||||
61 | CV.ROHANA MITRA SEHATI - 02.748.658.8-009.000 | |
|
|||||||||
62 | CV.Ratu Eva Karya Duta - 02.170.462.2-434.000 | |
|
|||||||||
63 | Nabiel Putra - 90.502.341.2-419.000 | |
|
|||||||||
64 | CV. LINE ARCHTECTURE CONSULTAN - 03.047.959.6-211.000 | |
|
|||||||||
65 | CV Detail Engineering - 31.334.116.6-403.000 | |
|
|||||||||
66 | CV. KEMUNING SEMBILAN - 01.910.368.8-429.000 | |
|
|||||||||
67 | CV. MUTIARA KARYA UTAMA - 02.703.180.6-003.000 | |
|
|||||||||
68 | TIO - 90.531.463.9-432.000 | |
|
|||||||||
69 | CV MAJU TERUS - 81.277.592.2-436.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak